
Project: 69 km length Drainage Channel Treatment
Scope : Wastewater Treatment
Location : Kitchener Drain / Egypt
90 mobile treatment plants for sewage to the villages which are not served by networks with an estimated cost of 760 million pounds
waste management and recycling for wastewater and biomass
Project: 69 km length Drainage Channel Treatment
Scope : Wastewater Treatment
Location : Kitchener Drain / Egypt
90 mobile treatment plants for sewage to the villages which are not served by networks with an estimated cost of 760 million pounds
Project: 10 Mobile INNPT Plants
Scope : Wastewater Treatment
Location : Egypt
Design and implementation in co-operation with EEAA
Project: 400 m3/d fixed INNPT Plant
Scope : Wastewater Treatment
Location : Fayoum / Egypt
Design and implementation
Project: Textile Factory Waste Solution
Scope : Wastewater Tratment
Location : Düzce / Turkey
Project: Carpet Factory Waste Solution
Scope : Wastewater Tratment
Location : Düzce / Turkey