AMG smart Charcoal furnaces
AMG ENVIRO LLC USA
AMG SMART FURNACE TECHNOLOGY
Convert wood lump and biomass waste to
charcoal with high fixed carbon ratio
Gasification technology as thermal heating
source from waste
AMG smart furnaces with different sizes
10 M
3
, 30 M
3
, 42 M
3
, 60 M
3
Charcoal yield up to 34 %
For more info . . .
info@amg-enviro.com
COMPETITIVE ANALYSIS
•Small charcoal
furnace with
10 M
3
•3 M
3
•90 tons
Competitors
•big size
•process time
•Fuel used
•Fuel cost / ton
•Charcoal yield
•Area required
Strengths
•Special
request for big
production
rate
•Wood supply
Weaknesses
TECHNOLOGY
Smart slow pyrolysis technology
Direct heating
Heat exchange
Thermal efficiency
80 % in gasification process
93 % in heat exchange
Environmental friendly emissions
CO , CH
4
, SO
X
,NO
X
ARE WITHIN LIMITS
Gas cleaning system before final exit
!
TEAM RESOURCES
State
assumptions
about
resources
allocated to
this project
R& D staff
Phd’s
consultants
Engineering
dept
Smart PLC
system
Gas cleaning
system
Asharqiah
plant
Ideco plant
Technical
team
Technical
consultant
staff
High tec
factories
Internet
marketing
Direct sales
exhibtions
PROCEDURES
AMG SMART FURNACES
Different business commercial sizes
Automated system
Easy to operate
High charcoal yield
High IRR
PROCEDURES
Gasification system
as thermal energy
source
Environmental friendly emissions
Support public economy
Save LNG , LPG imports
Reduce operation cost
AMG C 450
GASIFICATION SYSTEM
GASIFICATION RAW MATERIAL
GASIFICATION AND BURNERS
GASIFICATION AND BURNERS
CHARCOAL
CHARCOAL
BIOMASS CARBONIZATION MACHINE
AMG SMART FURNACES
AMG CHARCOAL FURNACES
Model AMG C 110 AMG C140 AMG C300 AMG C 450
AMG C
540
Outer dimension 2.5*2.50 6*2 6*2.50 8.25*2.50 6*4.5
furnace 2*2.0
capacity m3 6.30 10m3 30 m3 42 m3 60 m3
Capacity Ton 2.70 5.00 18.00 25.00 30.00
No. Of Furnaces 3.00 1.00 1.00 1.00 1.00
Carbonization Time 4.00 6.00 6.00 8.00 12.00
Cooling Time 8.00 4.00 4.00 4.00 6.00
No. of cycles/d 3.00 2.00 2.00 2.00 1.50
Energy source AMG GASIFIER AMG GASIFIER AMG GASIFIER AMG GASIFIER AMG GASIFIER
energy volume 300 KG waste 500 KG WASTE ONE TON WASTE ONE TON WASTE 1.25 TON WASTE
energyUnit price 400.00 400.00 400.00 400.00
Total energy cost USD 25.00 25.00 50.00 50.00 65.00
charcoal yield % 0.34 0.34 0.34 0.34 0.34
Actual monthly Production 110.00 140.00 300.00 450.00 540.00
THANKS FOR YOUR GOOD TIME